§ 6-142. Fees.  


Latest version.
  • Section 106.5.2. Fees. The following fees are established:

    1.

    106.5.2 Schedule of permit fees. On buildings, structures, or alterations requiring a permit, a fee shall be paid as required, in accordance with the schedule as established by the City of South Houston (Exhibit A).

    Mechanical Permit Fees

    Sec. 106.5.2 Fee Schedule

    Type of Construction Price
    Air conditioning/heating $40.00 per unit, plus $5.00 per ton
    Duct extension or addition $25.00 each plus $4.00 each run outlet
    Duct system only, residential $40.00 per unit
    Duct system only, commercial $40.00 per unit plus $2.00 per outlet
    Refrigeration $30.00 per unit plus $4.00 per hp
    Boilers $30.00 per unit(minimum 5 hp), plus $3.00 per added hp
    Annual boiler operating permit $30.00
    New cooling tower installation $40.00 each plus $2.00 per ton
    Cooling tower replacement $40.00 each
    Chiller replacement $40.00 each plus $2.00 per ton
    Heating unit only $40.00 per unit
    Commercial vent hood $30.00 per vent hood
    Ventilating equipment or fans over 2000 cfm $20.00 each
    Miscellaneous $35.00
    Minimum permit fee $35.00 + application fee
    Re-inspection fee $35.00
    Application fee $10.00
    Working without a permit $250.00 or double the permit fee, whichever is greater

     

    2.

    Fee refunds. Fee refunds, if any, shall be made in accordance with Sec. 106.5.3.

(Ord. No. 2010-13, § 2, 9-14-10; Ord. No. 2014-01, § 1(Exh. A), 1-14-14; Ord. No. 2014-19, § 1(Exh. A), 8-12-14)